For the two week period, beginning at 6 a.m. on Monday, April 24, and continuing through Sunday, May 7, the bridge that connects the Medical Office Center to the Bridge Building will be closed for flooring repairs.
The bridge will reopen on Monday, May 8. During this time period, patient, visitor and staff traffic will be rerouted through the East Side, emergency department entrance between the Davol Building and the Bridge Building. See map for directions.